Menu 特餐 Mains

M1 Made at: OPG

OPG Modification Portfolio

Led a portfolio of planned-outage and in-service plant modification projects under engineering change control.

  • modification packages
  • project budgets
  • vendor coordination
  • configuration management
Prep time
16 months
Spice
Status
Done

Overview

During a 16-month co-op at Ontario Power Generation (OPG), I worked as Modification Team Lead in Plant Design. I led a portfolio of plant modification projects. Some were planned-outage work and some were done while the plant was in service. All of them followed engineering change control.

TODO: add one or two sentences on the kind of work these modifications covered. Only include what OPG is comfortable having public.

My Role

As Modification Team Lead, I:

  • Prepared modification packages
  • Managed temporary modifications
  • Built project budgets
  • Coordinated vendors

Process

TODO: walk through how one modification moved from request to close-out. Mention the engineering change control steps and who you worked with.

Results

TODO: add outcomes you can share, such as the number of projects, the size of the budget or any recognition. Check what can be public first.

Back to menu

Order something else

M2

OPG Project Reporting Tools

Made at: OPG

Built dashboards and automations used by 30+ projects across 3 departments.

  • Power BI
  • Power Automate
  • Python
  • Excel
Prep time
co-op
Spice

M3

Heat-Pump Cost & Energy ML Model

Made at: TMU Research

Helped design a machine-learning model evaluating heat-pump cost and energy use for the TRCA, integrating weather data.

  • Python
  • machine learning
  • weather data
Prep time
May–Sep 2024
Spice

點餐紙Order slip

Tick what you would like to see, then check out.

特餐 Mains
小食 Sides
甜品 Desserts

0 items ticked