Led a portfolio of planned-outage and in-service plant modification projects under engineering change control.
Overview
During a 16-month co-op at Ontario Power Generation (OPG), I worked as Modification Team Lead in Plant Design. I led a portfolio of plant modification projects. Some were planned-outage work and some were done while the plant was in service. All of them followed engineering change control.
TODO: add one or two sentences on the kind of work these modifications covered. Only include what OPG is comfortable having public.
My Role
As Modification Team Lead, I:
- Prepared modification packages
- Managed temporary modifications
- Built project budgets
- Coordinated vendors
Process
TODO: walk through how one modification moved from request to close-out. Mention the engineering change control steps and who you worked with.
Results
TODO: add outcomes you can share, such as the number of projects, the size of the budget or any recognition. Check what can be public first.
Photos
Order something else
OPG Project Reporting Tools
Made at: OPG
Built dashboards and automations used by 30+ projects across 3 departments.
Heat-Pump Cost & Energy ML Model
Made at: TMU Research
Helped design a machine-learning model evaluating heat-pump cost and energy use for the TRCA, integrating weather data.